Typical Floor Screed Drying Time
The range of floor screed drying times before tiling is quite wide, and here are examples based on 75mm think application.
Standard Calcium Sulphate – 110 days
Traditional Sand and Cement – 75-100 days
Cementitious Belitex – 21 days
Mapescreed 704 – 7 days
Hydraulic Binder Fast Drying Screed – 24 hours
Ardex A35 – 4 hours
Moisture Testing
The method for moisture test will depend on the screed type, however, the used methods are:
Carbide bomb
Hair hygrometer
Protimeter
Before laying any tiles, a moisture test needs to be carried out, as this is the only way to be sure that the screed is dry enough to receive the tiles.